A light at the end of the bridge

The Virginia Department of Transportation has extended the time of the green light at the bridge repair job on U.S. 221 near the intersection with Franklin Pike north of Floyd.

We had passed on concerns about the short (15 seconds) of time of the light which controls the single-lane traffic each way through the construction zone. Resident Highway Engineer Bob Beasley investigated the matter and the time has been extended, which lets more cars get through.

Thanks Bob.

The Virginia Department of Transportation has extended the time of the green light at the bridge repair job on U.S. 221 near the intersection with Franklin Pike north of Floyd.

We had passed on concerns about the short (15 seconds) of time of the light which controls the single-lane traffic each way through the construction zone. Resident Highway Engineer Bob Beasley investigated the matter and the time has been extended, which lets more cars get through.

Thanks Bob.

Share:

Share on facebook
Facebook
Share on twitter
Twitter
Share on pinterest
Pinterest
Share on linkedin
LinkedIn

Comments are closed.

On Key
Related Posts
Keeping time around the world

Keeping time around the world

In a period of my adult, professional, life, I spent many days (and nights) on planes flying around the world. For many of those years,